Projects in the Russian Federation

Real Estate

On the Russian Federation Territory, Petroholding is active mainly with tailored and customized real estate projects on behalf of its private clients, working side by side with reputed architects specialized in dream villas and prestigious houses. The company is also operating as an exclusive advisor with the objective to find or sell significant and prestigious buildings on behalf of both companies and private owners. The pipeline and portfolio of current properties is available only upon written and qualified request.

Oil & Gas

2011

Customer: Gazprom Transgaz Saint Petersburg LLC
Total reconstruction of technological pipeline of the “Kholm – Zhirkovskiy compressor station of #3 Compressor department” Kholm – Zhirkovskiy Line Production Department of Main Pipelines
– Total overhaul of section isolation valves of Main gas pipeline “Torzhok – Minsk – Ivatsevichi – 2” 198-201 kм, Kholm – Zhirkovskiy Line Production Department
– Total overhaul (total replacement) of1220mm Main gas pipeline “Torzhok – Minsk – Ivatsevichi – 3”, 197-201 kм, Kholm – Zhirkovskiy Line Production Department
– Total overhaul of main equipment of Gas Distribution Station “Dukhovshchina” Smolensk Line Production Department of Main Pipelines
– Total overhaul (total replacement) of 1,020 mm main gas pipeline “Valday – Pskov – Riga”, Valday Line Production Department of Main Pipelines

2010

Customer: Gazprom Transgaz Saint Petersburg LLC
– Total overhaul (total replacement) of 1,020 mm main gas pipeline“Valday – Pskov– Riga”, Valday Line Production Department of Main Pipelines
– Total overhaul (re-isolation) of 720 mm gas pipeline bend “Vostochnaya Gas Distribution Station”, Severnoye Line Production Department of Main Pipelines
– Total overhaul (total replacement) of 1,220 mm main gas pipeline“Torzhok – Minsk– Ivatsevichi – 2”, Smolensk Line Production Department of Main Pipelines
– Total overhaul (total replacement) of 1,220 mm main gas pipeline“Torzhok – Minsk– Ivatsevichi – 2”, Kholm- Zhirkovskiy Line Production Department of Main Pipelines

2009

Customer: Gazprom Transgaz Saint Petersburg LLC
– Total overhaul (total replacement) of 1,220 mm main gas pipeline“Torzhok – Minsk– Ivatsevichi – 2”, Smolensk Line Production Department of Main Pipelines
– Third stage of full repair of Gas Distribution Station “Smolenskay State District Power Plant”, Smolensk Line Production Department of Main Pipeline
– Total overhaul of technological pipeline of the compressor station “Smolenskaycompressor department-3”, Smolensk Line Production Department of Main Pipelines
– General overhaul(re-isolation) of 1,020 mm main gas pipeline“Belousovo – Leningrad”, Kolpinsk Line Production Department of Main Pipelines
– Repair of technological gas purification system of the compressor station “Smolenskay compressor department – 2, 3”, Smolensk Line Production Department of Main Pipelines
– Total overhaul (re-isolation) of main gas pipeline“Leningrad– Vyborg– Gosgranitsa- 1”, 34-55 km.

2008

Customer: Lentransgaz LLC
– Total overhaul (re-isolation) of 1,020 mm main gas pipeline“Torzhok – Valday”, Torzhok Line Production Department of Main Pipelines

Customer: Gazprom Transgaz Saint Petersburg LLC
– Total overhaul (total replacement) of 1,220 mm main gas pipeline“Torzhok – Minsk– Ivatsevichi – 2”, Smolensk Line Production Department of Main Pipelines
– Total overhaul (total replacement) of 1,020 mm main gas pipeline“Gryazevets – Leningrad– 1”, Volkhovsk Line Production Department of Main Pipelines
– Total overhaul (re-isolation) of 1,020 mm main gas pipeline “Belousovo – Leningrad”, Severnoye Line Production Department of Main Pipelines
– Second stage of general overhaul of Gas Distribution Station “Smolensk State District Power Plant”, Smolensk Line Production Department of Main Pipelines

Customer: Gazpromstroyengineering LLC
-Boiler house construction and equipment in Noginsk Gas Transmittal Pipelines Administration of Mostransgaz LLC